A construction daily report app your site managers will actually use

Site managers know what happened today; typing it up at 6pm is the problem. We build an Android app (and a web version) where they record weather, crews, deliveries, delays, instructions and progress by voice, photo and quick checklists, even without signal. The app drafts the daily log, the site manager edits and approves it, and it syncs to Procore, Fieldwire or your document store. Projects typically cost $6,000 to $16,000 and take eight to twelve weeks.

The problem

Why construction daily logs get skipped

The daily log is the site's legal memory: who was on site, what was delivered, what instructions arrived and what held the work up. When it is rushed or skipped, claims for delay and variations become arguments without evidence.

Off-the-shelf construction daily log apps are often built for office users, with long forms that do not fit how a superintendent or site manager works. Signal on site is unreliable, gloves make typing hard and the log ends up as a few lines written days later.

What we build

What our construction daily report app includes

Voice-first capture

Short voice notes through the day, transcribed and sorted into the right log sections.

Photos with context

Photos tagged to location, trade and issue, with time and GPS where allowed.

Quick checklists

Weather, crews and headcount, deliveries, visitors and plant in a few taps.

Works offline

Everything is saved on the device and syncs when signal returns.

Draft log for approval

The app drafts the daily report; the site manager edits and approves it before it is filed.

Sync to your system

Approved logs, photos and flagged instructions sent to Procore, Fieldwire or your document store.

Who does what

Automation does the chasing, people make the calls.

Every step is marked: what runs on its own, what a member of staff reviews and what stays with a person who decides.
  1. 01 Automated

    Capture through the day

    The site manager records voice notes, photos and checklist items, online or offline.

  2. 02 Automated

    Draft log built

    Notes are transcribed and sorted into weather, labour, deliveries, delays and instructions.

  3. 03 Automated

    Instructions flagged

    Possible instructions, delays and safety notes are flagged for the project manager.

  4. 04 PM or estimator review

    Site manager approves

    The site manager edits and approves the log; nothing is filed without approval.

  5. 05 Site manager or director decides

    Contractual decisions

    Whether a flagged item is a variation, delay event or safety issue is decided by the PM and site manager.

How it behaves

How the daily log app behaves

What each person sees and what runs in the background, including what happens when something goes wrong.

What the site manager sees

  • Big buttons for voice notes, photos and checklists
  • A draft log at the end of the day to edit and approve
  • Everything saved even with no signal

What the project manager sees

  • Approved logs filed to the project every day
  • Possible instructions, delays and safety notes flagged
  • Photos tagged to location and trade

What the automation does

  • Transcribes and sorts notes into log sections
  • Syncs approved logs and photos to the project system
  • Never files a log without approval

Edge cases and fallbacks

No signal all day
Captured offline and synced later; drafting runs after sync.
Voice note unclear
Kept as audio with a flag for the site manager to fill in.
Phone lost or replaced
Data synced so far is safe; unsynced notes are lost, so the app syncs whenever it can.
Project system API outage
Approved logs queue on the server and retry, with an alert to the office.

Architecture

A daily report app for site managers at a glance.

The setup we usually start from. We adapt it to the phone system and practice software you already use.
Site manager Voice, photo, taps Mobile app Offline first Transcribe, sort Draft daily log Approval Site manager edits Project manager Flagged items Project system Procore, Fieldwire
  • Input
  • Logic and services
  • AI step
  • People
  • Data

How it flows

  1. 1 Through the day the site manager records voice notes, photos and quick checklist items.
  2. 2 The app stores everything offline and, once synced, transcribes and sorts it into a draft daily log.
  3. 3 The site manager edits and approves the log, with possible instructions and delays flagged.
  4. 4 Approved logs and photos go to the project system, and flagged items reach the project manager.

Project planner

How the project runs, phase by phase.

Typical durations for a first version. Your proposal lists the exact phases, dates and what you sign off at each step.

Construction daily report & site log app project plan

Typical time to launch: about 9 weeks, then support

  1. 01

    Discovery

    About 1 week

    Site visits, current log format, contract requirements, devices and project system.

  2. 02

    UX design

    1 to 2 weeks

    Screens tested with site managers on real phones, gloves and sunlight included.

  3. 03

    Build

    3 to 5 weeks

    Android app, web version, offline storage, transcription, drafting and sync.

  4. 04

    Pilot

    About 2 weeks

    Two sites use the app while keeping their old log, and we adjust.

  5. 05

    Release

    2 to 3 days

    Managed release to company devices or Google Play, and training.

  6. 06

    Support

    Ongoing

    Bug fixes, Android updates and new log sections.

What it runs on

Real products only, connected through the access each vendor provides. See all integrations

Kotlin Android app or a cross-platform framework Laravel or Node backend Procore REST API (daily logs) or Fieldwire API Speech-to-text and Claude or OpenAI for drafting Offline storage with background sync Your document storage

Cost estimate

What it costs, line by line.

Estimates to plan with. Your fixed quote follows a free call, once we have seen your systems and volumes.
  • Discovery and site visits

    Log format, contract needs, devices and system mapping.

    $600 – $1,500

  • UX design

    Screens tested with site managers.

    $1,000 – $2,500

  • App and backend build

    Android and web app, offline storage, drafting and approval.

    $2,800 – $8,000

  • Integrations

    Procore or Fieldwire, storage and transcription.

    $800 – $2,500

  • Pilot, testing and release

    Two-site pilot, fixes, release and training.

    $800 – $1,500

  • Total project estimate

    $6,000 – $16,000

Optional monthly care after launch is quoted with your proposal. Fixed quote after discovery. Google Play developer account, hosting, transcription and AI usage are billed to you directly. An iOS version is quoted separately.

Monthly running costs you pay directly

Estimates from the vendors' published pricing, checked November 2026. Billed to you by each vendor, never marked up.

  • Google Play developer account: A one-time registration fee paid to Google if you publish on Google Play.
  • Hosting: Your server or cloud plan for the backend.
  • Transcription and AI usage: Billed by the provider per use, depending on how many minutes of voice notes are recorded.

What pushes cost up

  • Systems without an API, or with integration access that must be requested from the vendor
  • Writing data back into your core system rather than only reading from it
  • Several locations, brands or very different processes to support
  • Custom apps, dashboards or a voice line on top of the workflows

What keeps cost down

  • One location and one clear process to start with
  • Cloud software with a documented API
  • Using tools you already pay for instead of adding new ones
  • Approved wording and sample data ready at the start
Get a fixed quote

Privacy and consent

Rules we design for, with the sources.

General information to plan with, not legal advice. Your counsel or data protection adviser confirms what applies to your practice.

US: OSHA injury and illness records

Most construction employers must keep OSHA injury and illness records under 29 CFR Part 1904. The app can flag incidents for the person who keeps those records; it does not decide what is recordable.

Source: www.osha.gov

UK: CDM 2015 site information

Principal contractors manage and monitor health and safety in the construction phase; the log supports that record but safety judgements stay with competent people.

Source: www.hse.gov.uk

EU and UK: photos and location data

Photos and GPS can capture workers and the public, so location tagging is optional and storage follows data minimisation.

Source: gdpr-info.eu

How we deliver

Agile delivery, in 1 to 2 week sprints.

We deliver in short Agile sprints using Scrum, so you see working software every one or two weeks instead of waiting for a big reveal at the end.

Every sprint

  1. 1 Sprint planning. At the start of each sprint we agree which backlog items we will finish, each with written acceptance criteria you can check.
  2. 2 Daily stand-up. A short internal check-in on progress and blockers. You get a written update in your Slack or Teams channel, not another meeting.
  3. 3 Sprint review and demo. At the end of each sprint we demo what was built on test data or in a shadow run, and you accept it or ask for changes.
  4. 4 Retrospective. The team looks at what went well and what to change in the next sprint, and we share anything that affects you.

How scope stays under control

Product backlog
Every feature, fix and question in one prioritised list you can see at any time.
Acceptance criteria
Plain-language conditions for "done" on each item, agreed before work starts.
Change requests
New ideas go into the backlog with an estimate. Nothing changes scope or price without your written approval.
User acceptance testing (UAT)
Before launch your team tests the real workflow against the acceptance criteria and signs off.

Tools we use

Jira, ClickUp or Trello for the backlogSlack or Microsoft Teams for updatesGitHub for code and version historyLoom or a live call for demos

Project manager / Scrum master

Runs the sprints, keeps the backlog and timeline honest, and is your single point of contact.

Business analyst

Maps how the work runs today, writes the workflow specification and acceptance criteria with your team.

Automation engineer

Builds the n8n workflows, integrations, AI steps and error handling.

Backend developer

Writes custom code where a no-code step is not enough: APIs, data sync, secure storage.

Frontend / mobile developer

Builds forms, booking pages, dashboards, web apps or Android apps when the project needs them.

QA engineer

Tests every workflow against the acceptance criteria, including edge cases and failure paths.

DevOps engineer

Sets up hosting, access, backups, monitoring and alerts, and the deployment pipeline.

Who does what at each phase

Free call
Project manager, business analyst
Understand the problem, check it is worth automating and outline a rough range.
Discovery
Business analyst, automation engineer
Map the current process, systems and data, and agree success measures.
Design
Business analyst, automation engineer, backend developer
Write the workflow specification, data flows, compliance notes and backlog with acceptance criteria.
Sprints
Automation engineer, developers, QA
Build, test and demo in 1 to 2 week sprints; you accept or adjust after each demo.
UAT and launch
QA, DevOps, project manager
Your team tests and signs off, we switch on, monitor closely and train the team.
Support
Automation engineer, DevOps
Stabilisation window, then optional monthly care with monitoring and changes.

A point of contact

One person who can answer questions and approve decisions, with about an hour a week during the project.

Access

Admin or API access to the systems involved, created as separate accounts with the least access needed.

Sample data

Real but non-sensitive records (or de-identified ones) so we can design and test against reality.

Approved wording

Message templates, policies and consent wording (for SMS, your opt-in and opt-out text) reviewed by you.

Vendor agreements

Signed agreements with the software vendors that will handle personal data, such as a BAA or processor contract.

Time for testing

A few hours from the people who will use the system, for the demos and user acceptance testing.

Working system

Workflows, integrations and any apps running in your accounts, under your keys.

Documentation

Workflow specification, data-flow map, run book and exported workflow files.

Training

A walkthrough for the team and a short recorded video for new starters.

Handover

All access, credentials and code handed over; you can keep us or take it in-house.

Stabilisation window

Fixes for anything that does not meet the agreed acceptance criteria after launch.

Support options after launch

  • No plan

    You run it yourselves after the stabilisation window and contact us when you need a change.

  • Monthly care

    Monitoring, error alerts, small changes and updates each month, with an agreed response time.

  • Priority care

    Faster response times for business-critical workflows and a monthly review call.

How a project moves through our team

Free call PM and analyst Discovery Process and data Design Spec and backlog Sprints Build, test, demo Your review Accept or adjust UAT and launch Sign-off, go live Support Monitor and improve
  • Input
  • Logic and services
  • People
  • Output
  • Data

How it flows

  1. 1 A free call with the project manager and business analyst to understand the problem and whether it is worth building.
  2. 2 Discovery and design produce a written specification, data-flow map and a backlog with acceptance criteria.
  3. 3 The team builds in 1 to 2 week sprints; you review a demo at the end of each and accept or adjust.
  4. 4 Your team runs user acceptance testing, we launch, then monitor and improve under a support plan.

FAQ

Construction daily report app questions questions, answered.

Off-the-shelf apps suit many firms. A custom app makes sense when your log format, contract requirements or site conditions do not fit, or when site managers simply will not use the forms. We start by checking whether your current platform can be configured instead.

Yes. Everything is saved on the device and synced when signal returns. Transcription and drafting run after sync.

It drafts it from the day's notes and photos. The site manager reads, edits and approves the log before it is filed, because it is their record.

Yes. Procore and Fieldwire both have documented APIs, and approved logs and photos can be posted to the project. We confirm the fields with your setup.

The first version is Android plus a web version that works on any phone browser. An iOS app can be quoted separately if your teams need it.

Share of days with an approved log, time spent writing logs and how often flagged instructions reach the project manager the same day.